// assembly line ops

Production Target Calculator

MULTI-LINE MODE  ·  7H SHIFT BASE  ·  STD 10 PEOPLE
LIVE CALCULATOR
Shift Parameters
Standard = 7 hr
Standard = 10
Product Selection
Qty = optional 0 lines
Style
Size
Qty
Product
Std Cases
Total Cases
Combined Targets Summary
Total Daily Cases
—
all lines combined
Total Hourly
—
cases / hour
Total Qty Cases
—
with quantities applied
Staff Adj. Total
—
with actual headcount
Time Adj. Total
—
with actual shift hrs
Line Style Size Product Qty Std Cases Total Cases Cycle (min) Cycle (sec) Hourly Labor min/case Time Adj. Staff Adj.
Formulas Reference
Shift minutes= Hours × 60
Cycle time (min)= Shift min ÷ Std cases
Cycle time (sec)= Cycle min × 60
Labor min/case= Cycle min × 10 ppl
Adj. by time= Avail. min ÷ Cycle min
Adj. by staffing= Std cases × Actual ÷ 10
Total qty cases= Std cases × Qty (optional)
Reference Lookup Table
Style Size Retail Name Std Cases / 7h Cycle (sec) Hourly